Under river, outside time: The Woolwich Foot Tunnel Anomaly

This is a repost promoting content originally published elsewhere. See more things Dan's reposted.

Under river, outside time: The Woolwich Foot Tunnel Anomaly (Portals of London)

When the Woolwich foot tunnel closed for repairs in 2011, it should have been a routine job. The pathway had been providing pedestrians with a quick route beneath the Thames since 1912. A century o…

When the Woolwich foot tunnel closed for repairs in 2011, it should have been a routine job. The pathway had been providing pedestrians with a quick route beneath the Thames since 1912. A century on, a few minor improvements were necessary. Contractors were hired to plug holes, improve access and bring communications capabilities into the 21st Century: swapping leaky tiles for a leaky feeder.

But Woolwich residents will recall that the refurb of this much loved and much used walkway did not go according to plan. When it finally re-opened it was 8 months behind schedule, having been closed for more than a year and a half. What the average Woolwich dweller doesn’t know, however, are the unusual circumstances behind this delay.

0 comments

    Reply here

    Your email address will not be published. Required fields are marked *

    Reply on your own site

    Reply by email

    I'd love to hear what you think. Send an email to b8440@danq.me; be sure to let me know if you're happy for your comment to appear on the Web!